Home

Retrofitting & Modernisation of Industrial Automation

Modernisation of obsolete automation systems, such as Siemens S5 to TIA S7 migration, with reduced downtime and preserved control logic.

APINEQ modernises obsolete automation systems. We replace what has reached end of life, preserving and improving the control logic in service. We hand the installation or machine back running, fully documented and ready to maintain. The work rests on a simultaneous command of the legacy Siemens S5 and the current S7.

Siemens SINAMICS variable-speed drives in an APINEQ switchboard
Drive modernisation with SINAMICS variable-speed drives

Siemens S5 → TIA S7 migration

S5-to-TIA-S7 migration is the core of this specialty. The control logic of the obsolete PLC is reprogrammed onto the current TIA platform, preserving the behaviour production already knows. The dependence on a discontinued technology is removed, and the system can then be maintained in TIA S7 by any current technician.

Surveying installations with no documentation

Many old systems no longer have diagrams or a documented program. Before modernising, we survey on site: we identify and verify the signals point by point and reconstruct the logic and the electrical diagram of the existing installation. Modernisation starts from a verified basis, not from guesswork.

Modernisation with reduced downtime

The new control system — PLC program and switchboard — is developed and tested in the workshop, with the signals simulated, before any on-site work. In the field, the work is limited to replacing, connecting and tuning a system that has already been validated. The production stoppage is planned and kept to the minimum.

Electrical and software retrofitting

Modernisation covers both fronts. On the software side, the PLC, the SCADA and the DCS. On the electrical side, the switchboards, the drives, the variable-speed drives and the control gear. The modernised installation is coherent across both parts.

Modernisation often starts with a breakdown. Technical support assesses whether the system is still worth repairing or whether it’s time to modernise, with clear scope and cost.

What we do

  • Siemens S5 → TIA S7 migration, with reprogramming of the control software
  • Replacement of obsolete PLCs and control systems
  • Surveying and reconstruction of undocumented installations
  • Electrical retrofitting: switchboards, drives and control gear
  • Software retrofitting: PLC, SCADA and DCS
  • Planned work to reduce downtime

Have an obsolete system that needs modernising?

Tell us what you have — which equipment, how old, what problems it shows. We assess whether modernising pays off and come back with a proposal covering scope, schedule and price.

Request a quote →

Related: Industrial Automation · Technical Support · Electrical Design

Have a project in mind?

Talk to us and we will work out the best solution for your installation.